Steel structure slab concrete construction plan(5)
The main construction process: measuring the release line → installation of steel plate template around the floor → short beam welding on the steel beam → steel banding → reserved hole template installation → floor concrete pouring
5. Quality, safety and environmental protection measures
(1) The main content of its quality control is:
a. Strictly follow the process rules.
b. Actively control the quality of process activity conditions. The main factors affect the quality of the five major factors: construction operators, materials, construction machinery and equipment, construction methods and construction environment.
c. Timely inspection of the quality of the process.
d. Set process quality control points at critical locations or weak links.
In order to ensure that all construction personnel strictly abide by the construction process rules of each sub-project, before the construction starts, when the construction organization design is prepared, the key sub-projects all specify the construction process flow. Before the construction, the technicians control the established process flow and The corresponding construction operation procedures are on-site, so that every employee can understand how to operate.
(2) Safe construction:
Safe electricity use organization measures: establish a technical disclosure system. Introduce the general intentions, technical contents and precautions of the temporary power construction organization design and safety power technology and measures to professional electricians and various types of electricity users, and perform the signatures of the person and the person to be handed over on the technical texts. Procedures, indicating the date of delivery. Establish a safety inspection system and make a test record. "Three treasures, four mouths" and all kinds of temporary protection, must meet the requirements of the standard.
(3) Civilized construction:
Establish and improve a safety management system based on the responsibility system of production safety, with responsibility to people and strict implementation. Scaffolding is checked and repaired. Construction temporary electricity three-phase five-wire system and three-wire power distribution, two-level protection, and professional management. The construction machinery must be “three musts” (ie, the transmission part must have a protective cover, the transmission part must have a safety device, and the switch must have a leakage holder). At the same time, all personnel on the site must wear a badge with their name and position (type of work).