Metal 4S Auto Building

Project Descripation

   

The installation procedure of structural steel fabrication workshop mainly consists of steel column installation, column bracing installation, temporary seating of steel crane beam, roof beam and bracing installation, the correction and fixing of crane beam and the maintenance of installed steel structure.

       
  • Client :Qingdao Zhonghao Group 4S Auto
  • Location :Qingdao City, China
  • Surface Area : 1800 m2
  • Year Completed :2007